Integrity Testing Pty Ltd.

Total Assets Solutions!

Pull over test of concrete pole.

Ivanhoe, NSW.

About Us

Phone: 03 54440782

Fax: 03 54413810

E-mail: Info@integrity testing.com.au

Technical website http://www.integritytesting.com.au

 

 

 

INTEGRITY TESTING PTY.LTD.

Directors.

Mr. John S. Higgs, B.Sc. (Hons), MIEAust CPEng, C.Eng, M.I.C.E., C.Phys, MInstP

Mr. David J. Tongue, AMICE, MIQ, FDiag. Eng.

Specialist independent Consultants.

Metallurgical. Mr. Greg Hillard.

Corrosion. Dr Graham Sussex.

Cathodic Protection. Mr. Ian Godson & Mr. Warren Slater.

Laboratory. Mr. John Francisini, Sharp & Howells Lab.

Having the right experienced team to tackle any Total asset solutions is the answer to get the correct answer.

Bridges. Over 250 bridges tested in four years.

Poles. Over 21,000 of timber, steel and concrete tested.

Independent assignments. Ongoing projects in Vic, NSW, QLD and WA.

 

 

  

 

To contact us:

Pull over test. Load result correct. Bending

Result correct correct correct

Test on piled foundation of transmission tower.

The tower base excavated after our testing.

Result proved correct.

New Zealand

Total bridge assessment with both DBTS, Mod-Shock , reporting and repair design

Strategies. QLD.

 

Ipoh railway station Structural assessment and re-measurement survey– Upgrade and reuse.